All the milk crates have been taken down so I can start mounting the shelf brackets to the wall. I need at least three more 10x12 brackets for the long section along the wall and 4 16x20 brackets for the short section going towards the garage door. I will need to add table legs for the end section as well as Bear Creek Indutrial park and for staging. With my hectic work schedule and limited funds I wanted to have the benchwork completed by March 27th but I think that will be pushed back to the middle of April.